翻訳と辞書 |
Summit Middle School (Coquitlam) : ウィキペディア英語版 | Summit Middle School (Coquitlam)
Summit Middle School is a grade 6 to 8 public middle school within School District 43 Coquitlam, British Columbia. ==Construction== Construction of Summit started in 1997, as part of the NDP's cost-cutting initiative for new schools. Built to meet demand for school space created by a boom in the school-aged population, Summit was one of the first two schools to utilize new low-cost construction techniques — testing the processes, which were used on later schools in British Columbia. These cost 15% less per square meter of space than traditionally constructed schools. Summit Middle was completed by TASK construction management on August 14, 1998, ten and one half months from building excavation to occupancy, and was initially designed to hold 650 students. The total cost for the Summit Middle was $8,500,000.〔(【引用サイトリンク】 publisher = TASK Construction Management Inc. )〕 The school's building envelope is currently being remediated, in order to resolve issues with high moisture content inside the walls and to bring the building up to current industry performance standards. Existing stucco walls are being demolished and replaced with a Fibre Cement assembly. Additionally, the windows will be replaced with double-glazed aluminium windows and the south and west sides of the building will receive solar heat resistant glass. Construction work began April 2015 and is expected to finish by November 2015.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Summit Middle School (Coquitlam)」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|